Diva Envitec  |  Mining & Mineral Processing

The Tailings Dam Is Not The Problem.
What Reaches It Is.

35+ years of separation engineering, now applied to mineral recovery and mine-site water management.

95%+
Water Recovery at Thickener
36-61%
Less Tailings Volume to TSF
30-80%
Fresh-Water Reduction
3-6 pt
Fe Recovery Uplift

Recover Value First. Then Manage What Remains.

  • ✓Column & nanobubble-enhanced flotation recover fine/ultrafine mineral values conventional cells lose to tailings
  • ✓Paste & high-density thickening cuts tailings volume, TSF footprint, and dam-failure risk
  • ✓Membrane systems (UF/NF/RO, ceramic) recycle process water back into flotation and grinding
  • ✓AOP/UV-LED destroys cyanide & residual reagents for compliant discharge
Ore-wise engineered solutions for: Iron Ore · Copper · Bauxite · Gold · Zinc-Lead · Phosphate · Rare Earth
Reference result (Baotou Steel, Iron Ore): 95.5% water recovery, 20% cut in make-up water pumped 130 km, 36% less tailings to TSF — paste thickening vs. conventional.

Focused, number-driven pilot trials & feasibility studies.
If the numbers don't justify action, we'll say so.

Schedule a Technical Discussion
Prof. Lalit Vashista  |  Diva Envitec Pvt. Ltd.
lalit@divaenvitec.com  |  www.divaenvitec.com
Innovation Center, Gala No. 7, Building No. 1, Anila Shanti Industrial Estate, Waliv Village, Vasai, Thane 401205